Applying BIM and CDE in the Construction Phase: Effective BIM Implementation through Autodesk’s CDE
Picture a weekly site coordination meeting: the contractor asks which drawing is current, the supervising consultant asks whether last week’s RFI has been answered, and the owner asks why this work package is behind. Everyone opens a different folder, and nobody can answer right away.

The construction phase involves the most parties and the largest volume of records in a project. BIM and CDE help manage records and project information by creating a central repository for every stakeholder, keeping information flowing, reducing errors in communication and keeping the project on track.
This article works from concrete situations: 5 document management problems and 8 common site problems, each with a solution and a demo video. If you need the concepts first, see the overview of the common data environment (CDE); for the whole project lifecycle, see BIM information management by phase.
What do BIM and CDE solve in the construction phase?
The solution that connects workflows, teams and data across every phase of a project is the Autodesk Construction Cloud platform, now part of the Autodesk Forma ecosystem. In the construction phase, two products play the main role:
- Forma Data Management (formerly Autodesk Docs): the CDE that stores drawings, models and documents, with version control and approvals.
- Forma Build (formerly Autodesk Build): manages RFIs, submittals, issues, forms, schedules and meetings, with a mobile app for the jobsite.
Both share the same goal: connected workflows and secure collaboration around a single, accurate source of truth.

Project document management: 5 problems and how to solve them
A project generates an enormous volume of documents and information. Managing documents well brings major benefits to the project.


1. How do you standardize project documents?
Standardizing document naming (a Naming Standard) according to ISO 19650 saves time and makes it easier to automate records management. See choosing an ISO 19650-compliant CDE (in Vietnamese).

2. How do you save time managing and finding documents?
Digital tools provide powerful filters and search so teams can quickly find the information they need, and keep every version of a document without worrying about storage location or volume.

3. How do you compare differences between versions?
Document information, especially drawings, changes frequently during the project. A tool that automatically highlights changes between versions makes the job much simpler.

4. How do you manage quality and issues effectively and get information to the right people?
Digital tools bring every quality, safety and issue report into one place, with filters by status, type, creator and due date.

5. How do you automate document approval workflows?
Set up standard yet flexible automated workflows for every approval, so documents move through the steps in the right order with a full audit trail.
Site management: 8 common problems and how to solve them
A construction project requires coordination between many parties across many work packages and tasks, so it needs an integrated solution that connects all of these activities.

1. How do you manage RFIs and submittals effectively?
You need to know which step a contractor’s question has reached and who is holding up progress. Digitizing the process lets you track every item submitted, its processing time and its due date.

2. When the consultant reissues construction drawings, how does everyone get the new version?
Storing drawings in a single trusted source (the CDE) solves the problem of inconsistent data: when the consultant updates a drawing, every team member accesses the same source.

3. How do you control errors and defects on site effectively?
Track and manage defects, determine which individual or company is responsible, and follow their progress on the fix. Issues can be pinned directly to drawings and models.

4. How do you digitize inspection records and checklists and attach related information?
Inspection records and checklists come in very large numbers and need to be managed efficiently and found quickly. Digital forms let you store, retrieve and attach related information.

5. How do you connect defects, pending inspections, RFIs and submittals to the schedule?
Delays caused by defects, pending inspections, RFIs or submittals all affect the overall schedule. Connecting them to the schedule makes them much easier to manage.

6. How do you keep track of meeting information and follow up on action items?
Create one place that holds every meeting together with its information, action items and discussion history.

7. At project close-out, how does the owner keep as-built drawings and records and retrieve asset information?
As-built drawings and records are stored centrally, so the owner can retrieve them easily and they are ready to hand over to operations.

8. How do you link BIM models to project issues and check the as-built model?
Link BIM models to project issues and check that the as-built model correctly and fully reflects the information updated during construction. View models right on site and hand over digital assets.
To record site conditions over time and compare them against the model, you can add 360 cameras and AI.
How have contractors and owners applied it?
The two stories below show how BIM and CDE are brought into the construction phase: one in Vietnam with OneCAD’s support, and one in Europe.

Dat Xanh E&C (Vietnam): approving documents right inside the platform
On a high-rise project with many parties involved (design consultant, design reviewer, supervisor, contractors), approving documents through printouts and email used to take days. With OneCAD’s consulting and technical support, Dat Xanh E&C brought Revit, BIM 360 and Autodesk Build into its workflow, so drawings and equipment specifications are shared and approved in one system.
- Approval time cut by up to 2–3 hours per document at each approval step.
- Site reports on progress, cost, safety and technical compliance are better organized.
- According to CEO Le Hao, the company has digitized up to 90% of its work.

IDEC Group (France): Autodesk Build on a multi-building project
IDEC has applied BIM since 2016 and chose Autodesk solutions in 2017. In 2023, the new campus project in Blois was the first project on which IDEC made full use of Autodesk Construction Cloud, especially Autodesk Build.
- Centralized management of project documents and information.
- Real-time coordination between office and site, with fewer errors.
On the training side, PEC1 Group, a general contractor for electrical construction and installation, completed a CDE training program for the construction phase delivered by OneCAD experts over three consecutive days, from March 11 to March 13. After the course, OneCAD’s experts and R&D team will support a real PEC1 project. See the news on the training course (in Vietnamese).
How does OneCAD support BIM and CDE adoption on site?
OneCAD has been an Autodesk Gold Partner since 2017 and an Autodesk Authorized Training Center (ATC) since 2016, achieved Service Provider Select status in 2020 and was honored at the One Team Conference in 2022 for an Autodesk Construction Cloud project. For construction sites, we work in four steps:
- Assessment: understand the project team’s current processes for documents, RFIs, submittals and inspections.
- Setup: configure the CDE, naming conventions, permissions and suitable approval workflows.
- Training: get both office and field teams fluent on desktop and mobile.
- Ongoing support: technical support and continuous improvement once the project is live.
The ACC platform has achieved ISO 19650 certification; see the BSI Kitemark certification (in Vietnamese). Learn more about OneCAD’s capabilities or BIM and solutions from Autodesk.
Frequently asked questions about BIM and CDE in construction
When should the construction phase start using a CDE?
Set it up before the contractors start work: folder structure, naming conventions, permissions and approval workflows. When contractors and subcontractors join, they update project information directly in the CDE instead of through email and printouts.
Can the site team use it on their phones?
Yes. Forma Build (formerly Autodesk Build) has a mobile app so field teams can view drawings and models and update issues and forms right on site.
How does a CDE help control RFIs and submittals?
A digitized process lets you track which step each contractor question has reached, its processing time and its due date, so you can see which stage is slowing the project down.
When the project is complete, how are as-built records handed over?
As-built drawings and records are stored centrally in the CDE; the owner can retrieve them easily and reuse them for the operations phase. For details, see BIM information management by phase.
How do I get started?
You can sign up for a construction project digitization pilot or contact OneCAD for an assessment and a proposed implementation scope.
Start with a pilot project
Pick a project under construction, bring its drawings, RFIs, submittals and inspection records into one shared place, then measure the results. Sign up for a pilot or leave your details and a OneCAD engineer will get in touch.
Related products

Autodesk Forma Data Management is a cloud CDE for BIM data: store, version, review and share Revit and other files across the whole project lifecycle.

Forma Build (formerly Autodesk Build): cloud construction management for drawings, issues, RFIs, submittals, schedules and assets vs Essentials.

Next-generation, AI-powered jobsite photo documentation. OpenSpace is the fastest, simplest and most advanced tool available on the market.